Power shutdown in parts of city from today

6-hour shutdown for 6 days from 9 am every day   

Shillong, Nov 4: Parts of the state capital Shillong will be without power for six hours during daytime for six days from November 4 due to construction of a new 33KV feeder line at Mawlyndep.

The shutdown will take place from 9 am to 3 pm in parts till November 9, according to a notification issued by the Meghalaya Power Distribution Corporation Limited (MePDCL).

The areas to be affected by construction of the 33KV feeder line include – MES Assam Regimental Centre, Assam Rifles Office Complex, Assam Rifles Residential, MES Hospital, PGCIL, NERPC, NERLDC, Anthropological Survey of India, whole of Happy Valley, Mawshbuit, Madanrting, Wahrynthi, Laitkor Wahkdait and its adjoining areas.

The areas to be affected by construction of the 33KV Lad Smit feeder line are DGAR, Umphynai, Sohryngkham, Mawryngkneng, Mawlyndep, Puriang, Smit, Nongkrem, Thangsning, Jongsha, Mawkynrew, Kharang and its adjoining areas.

The MePDCL assured that efforts will be made to complete the work in time.

Hot this week

ANSAM rejects Kuki’s separate administration demand, says bifurcation not acceptable

Guwahati, Sept 8: Rejecting the separate administration demand of...

Meghalaya’s historic fiber paves the way for eco-friendly products and sustainable livelihoods

By Roopak Goswami Shillong, Oct 25: From making earbuds to...

Speeding truck rams Tura night bus, 4 passengers injured

Tura, Sept 5: Four passengers onboard a night bus...

The Baghmara connection to Meghalaya’s political history

Tura, Aug 17: For many in the state, Baghmara...

Attacks on minorities in Bangladesh: Indian Chakmas call for export ban

CDFI blames ISI, Islamic terrorists for Bangladesh unrest Guwahati Sept...
spot_img

Related Articles

Popular Categories

spot_imgspot_img