PM Modi to launch yellow line metro, Vande Bharat Express in Bengaluru

Bengaluru, Aug 10: Prime Minister Narendra Modi will inaugurate the much-awaited Yellow Line of Bangalore Metro and the Vande Bharat Express train between Bengaluru and Belagavi here on Sunday.

PM will also lay the foundation stone for the Bangalore Metro Phase-3 project. As per the itinerary shared by the Chief Minister’s Office, Modi will participate in three events during his nearly four-hour visit to the city.

Modi will be landing at the HAL Airport here at 10.30 am. He will then travel by helicopter and road to the KSR Bengaluru (city) railway station, where he will flag off Vande Bharat Express train between KSR Bengaluru-Belagavi.

He will also virtually flag off two more Vande Bharat Express trains between Amritsar-Sri Mata Vaishno Devi Katri, and Ajni (Nagpur)-Pune.

PM will then travel by road to the RV Road (Ragigudda) metro station on the Yellow Line. Between 11:45 am to 12:50 pm he will be flagging off Yellow Line (reach 5) and take a metro ride to the Electronic City station.

From there, Modi will travel to the International Institute of Information Technology (IIIT) Bengaluru, where he will be laying the foundation stone for Bangalore metro phase-3 and officially inaugurating the yellow line from RV Road (Ragigudda) to Bommasandra station, and address the gathering.

He will then travel by helicopter to the HAL Airport and fly back to Delhi at 2.45 pm.

According to PM’s office, the yellow line metro from RV Road (Ragigudda) to Bommasandra of Bangalore Metro Phase-2 project, having a route length of over 19 km and 16 stations, is worth around Rs 7,160 crore.

With the opening of this yellow line, the operational metro network in Bengaluru will increase to over 96 km, serving a large population in the region.

As per officials, the yellow line is expected to ease traffic congestion in several heavily congested corridors like Hosur Road, Silk Board Junction, and Electronics City Junction.

The Metro Phase 3, also known as the Orange Line, for which the PM will be laying the foundation, will be built at an estimated cost of Rs 15,611 crore.

The total route length of the project will be more than 44 km with 31 elevated stations. This infrastructure project will address the growing transportation needs of the city, catering to residential, industrial, commercial, and educational areas.

Phase 3 will have two corridors or lines: JP Nagar 4th Phase to Kempapura (32.15 km) and Hosahalli to Kadabagere (12.5 km).(PTI)

Hot this week

Pay hike of Assam ministers, MLAs likely as 3-member panel submits report

Full report likely by Oct 30 Guwahati Sept 25: There...

Meghalaya Biological Park Inaugurated After 25 Years: A New Chapter in Conservation and Education

Shillong, Nov 28: Though it took nearly 25 years...

ANSAM rejects Kuki’s separate administration demand, says bifurcation not acceptable

Guwahati, Sept 8: Rejecting the separate administration demand of...

Meghalaya’s historic fiber paves the way for eco-friendly products and sustainable livelihoods

By Roopak Goswami Shillong, Oct 25: From making earbuds to...

Meghalaya man missing in Bangkok

Shillong, Jan 10: A 57-year-old Meghalaya resident, Mr. Treactchell...

Meghalaya’s real challenge begins now: Building a strong local cricket talent pool

By Prarthana Hazarika Shillong, Nov 24: Meghalaya's triumph in the...

Keralam’s Wayanad set to become India’s first e-waste-free district

Thiruvananthapuram, Nov 24: Keralam's hill district of Wayanad is...

Rijiju lauds Jammu and Kashmir Waqf Board for its ‘good work’

Srinagar, Nov 24: Union minister Kiren Rijiju on Tuesday...

Paradip Port poised to emerge as major industrial hub, says Odisha CM

Bhubaneswar/Paradip, Nov 24: Odisha Chief Minister Mohan Charan Majhi...

FIR registered over bomb threat to Diljit Dosanjh’s Bengaluru concert

Bengaluru, Nov 24: An FIR has been registered against...
spot_img

Related Articles

Popular Categories