Entire Mumbai-Ahmedabad section of bullet train project will open by 2029: Vaishnaw

Surat, Sept 27: The 50-km stretch of India’s first bullet train project between Surat and Bilimora in Gujarat will open in 2027, and by 2029, the entire section between Mumbai and Ahmedabad will be operational, Railway Minister Ashwini Vaishnaw said here on Saturday.

After becoming operational, the bullet train will cover the distance between Mumbai and Ahmedabad in just two hours and seven minutes, he said, stressing that India’s first bullet train project is progressing very well.

Vaishnaw visited the under-construction Surat bullet train station and inspected track installation works and its first turnout installation.

“Overall progress of the first bullet train project is very good. The first 50-km section of the project between Surat and Bilimora will be open by 2027. We are preparing for that. By 2028, the entire Thane-Ahmedabad section will be commissioned, and by 2029, the entire Mumbai-Ahmedabad section will open,” he told reporters.

Vaishnaw stated that the speed potential of the main line is 320 kmph and 80 kmph for the loop line.

The railway minister stated that the most modern technologies are being utilized to ensure the safe and efficient movement of trains.

“This is a very complex movement of trains, that’s why the most modern technologies are being used. Several vibration mechanisms have been created here. The utility cable will take the vibrations whenever the train is moving at 320 kmph,” he said.

Even within the tracks, many mechanisms have been put in place to absorb any vibration, he added.

“There are very special safety features on the track so that the train is very stable, even if there is a very heavy gust of wind or a sudden earthquake,” said Vaishnaw.

Vaishnaw said the entire heavy work for Surat station is completed, and finishing and utility works are progressing faster along with the track link.

“Today, the first turnout has been installed here in the Surat station on the bullet train project. Turnout is the place where the track either joins or separates. A lot of new technologies have been used here, for example, these roller bearings on which the tracks will move. This is again a totally new technology that we are using. The sleepers are made of composite material,” he said.

Vaishnaw said the ambitious bullet train project will turn economies of all major cities from Mumbai to Ahmedabad into one and spur growth like Japan when the first bullet train was introduced.

“We hope to start work on the new projects very soon. In our party’s (BJP’s) manifesto, we have promised three more corridors in the north, one in the east, and one in the south. Mumbai-Ahmedabad is in the western part of the country. We will have four bullet train corridors as we go forward,” he said. (PTI)

Hot this week

Pay hike of Assam ministers, MLAs likely as 3-member panel submits report

Full report likely by Oct 30 Guwahati Sept 25: There...

Meghalaya Biological Park Inaugurated After 25 Years: A New Chapter in Conservation and Education

Shillong, Nov 28: Though it took nearly 25 years...

ANSAM rejects Kuki’s separate administration demand, says bifurcation not acceptable

Guwahati, Sept 8: Rejecting the separate administration demand of...

Meghalaya’s historic fiber paves the way for eco-friendly products and sustainable livelihoods

By Roopak Goswami Shillong, Oct 25: From making earbuds to...

Meghalaya man missing in Bangkok

Shillong, Jan 10: A 57-year-old Meghalaya resident, Mr. Treactchell...

State’s JJM coverage jumps from 1% to 84% in 7 years

Shillong, Sept 16: Meghalaya's rural tap water coverage under...

Rift in UDP: Metbah hints at action against Paul

Shillong, Sept 16: United Democratic Party chief Metbah Lyngdoh...

Meghalaya govt issues SOP for 138 MBBS counselling seats

Shillong, Sept 16: The Meghalaya government has notified the...

CM bats for more CCTVs in Govt offices  

Petrol bomb hurled at DMR office, car damaged   Shillong, Sept...

Man gets 25 years in jail for raping minor

Shillong, Sept 16: A POCSO court in East jaintia...

4 women labourers buried alive while demolishing run down house

Indore, Sept 16: Four women workers died and five...

India summons Pak CDA over collision between Pak Navy vessel and Indian warship

New Delhi, Sept 16: India on Wednesday summoned the...
spot_img

Related Articles

Popular Categories