Graft in NH project: SC upholds Meghalaya Govt’s 5-year ban on construction co

The ‘Business Promotion’ account in those ledgers recorded liquor, laptops, mobile phones, cameras, watches and other costly gifts for government officials…

Shillong, Nov 27: A five-year ban imposed by Meghalaya Government on a construction company has been upheld by the Supreme Court as it refused to interfere with the blacklisting order imposed for corrupt practices in a national highway project.

“We find no grounds to interfere with the impugned order(s) passed by the High Court. Accordingly, the Special Leave Petitions stand dismissed,” a Bench of Justice MM Sundresh and Justice Prasanna B Varale stated in its order.

The court was hearing pleas filed by M/s BSC-C&C JV and its lead partner, M/s BSCPL Infrastructure Ltd. against the Meghalaya government’s Public Works Department (Roads).

Meghalaya’s Advocate General Amit Kumar represented the state while senior counsel Mukul Rohatgi appeared for the petitioners.

The order means the State’s debarment order of December 3, 2024 — barring the JV and both its partners for five years from future tenders and contracts of PWD Meghalaya — has now been upheld by the Single Judge, the Division Bench of the High Court, and the Supreme Court.

The case traces back to 2009, when the Ministry of Road Transport and Highways floated a tender for two-laning of the Shillong-Nongstoin section of NH-44E and the Nongstoin-Rongjeng-Tura road under the Special Accelerated Road Development Programme for the North-East.

The contract was awarded to BSC-C&C JV on February 21, 2011, for Rs 1,303.83 crore. Work was completed on December 15, 2017, by which time the cost had risen through four revised estimates to Rs 2,406.46 crore.

The JV later invoked arbitration, claiming about Rs 487 crore more. To support its claim for delay costs, it produced its own ledgers.

The “Business Promotion” account in those ledgers recorded liquor, laptops, mobile phones, cameras, watches and other costly gifts for government officials, besides hospitality for members of the Dispute Review Board.

Acting on that material, the Chief Engineer (NH), PWD (Roads), lodged a criminal complaint on September 3, 2024. An FIR was registered at Sadar Police Station, East Khasi Hills. A show cause notice followed on September 16, 2024, and a reasoned debarment order was passed on December 3, 2024.

The High Court Single Judge dismissed the contractors’ writ petitions on December 17, 2025. A Division Bench headed by Chief Justice Revati Mohite Dere and Justice W Diengdoh dismissed the writ appeals on February 19, 2026.

The contractors contended that the State could not blacklist them after the work was completed and the defect liability period had expired, that the order went beyond the show cause notice, that no personal hearing was given, that the entries were ordinary festival and welfare expenses of about Rs 9 lakh, that no official or quid pro quo was shown, and that five years was disproportionate.

The central question was whether the State can debar a contractor for corrupt practices committed during execution of a public works contract, even after the contract has ended, on the basis of the contractor’s own records.

The Division Bench answered in the affirmative. It held that Clause 37 of the Instructions to Bidders and Clause 59.2(h) of the General Conditions of Contract permit action for corrupt practices in executing a contract, even after its conclusion.

It also held that the State has an inherent right to choose whom it does business with and to debar entities indulging in corrupt practices.

The Bench found that the show cause notice and the debarment order rested on the contractor’s own ledgers, admitted in cross-examination, that the explanation offered was an afterthought, that natural justice was complied with, and that there was neither delay nor mala fides.

Underlining the primacy of public interest, the Bench observed, “The State is under an obligation to put public interest over everything else. After all, the monies utilised is public money, which cannot be lost sight of.”

The ruling establishes that completion of a project is no shield for corruption during its execution, and that a contractor cannot offer gifts and hospitality to public officials, seek reimbursement from the exchequer, and then describe the expenditure as business expenses.

Advocate General Amit Kumar led the State’s case at every stage — before the Arbitral Tribunal where the ledgers came on record, before the Single Judge in 2025, before the Division Bench in February 2026, and before the Supreme Court on November 25, 2026.

He was assisted in the Supreme Court by Aditya Shanker Pandey, Advocate-on-Record, and Himanshu Sehrawat, Advocate, and in the High Court by AH Kharwanlang, Additional Senior Government Advocate, AS Pandey, Government Advocate, S Laloo, Government Advocate, and I Syiemlieh, Government Advocate.

The criminal case arising from the FIR remains under investigation and will proceed in accordance with law.

Hot this week

Pay hike of Assam ministers, MLAs likely as 3-member panel submits report

Full report likely by Oct 30 Guwahati Sept 25: There...

Meghalaya Biological Park Inaugurated After 25 Years: A New Chapter in Conservation and Education

Shillong, Nov 28: Though it took nearly 25 years...

ANSAM rejects Kuki’s separate administration demand, says bifurcation not acceptable

Guwahati, Sept 8: Rejecting the separate administration demand of...

Meghalaya’s historic fiber paves the way for eco-friendly products and sustainable livelihoods

By Roopak Goswami Shillong, Oct 25: From making earbuds to...

Meghalaya man missing in Bangkok

Shillong, Jan 10: A 57-year-old Meghalaya resident, Mr. Treactchell...

Deficit college teachers demand UGC pay scale  

‘Appointment letters contained the option for UGC pay scale’  Shillong,...

Census operations to begin on January 25  

Self-enumeration from January 10-24 before house-to-house survey   Shillong, Nov 27:...

Bangladesh may approach ICJ for Hasina’s extradition from India: Speaker Ahmed

Islamabad, Nov 27: Bangladesh may approach the International Court...

India ends BIMSTEC U-23 athletics meet on top with 47 medals

Bhubaneswar, Nov 27: India emerged champions with 47 medals,...

India thrash Malaysia 6-2 to enter final

Bhopal, Nov 27: Deepika scored twice as India outclassed...

French politician who stood up to Bush over the invasion of Iraq is back to stop Le Pen

Paris, Nov 27: Dominique de Villepin, the former conservative...

Strobe Talbott, architect of India-US relations post-Pokhrann-II, passes away

Washington, Nov 27: Former US diplomat Strobe Talbott, who...

President Murmu calls for Keralam to lead in evidence-based Panchakarma research

Thrissur (Keralam), Nov 27: President Droupadi Murmu on Friday...
spot_img

Related Articles

Popular Categories