ISRO commences revised countdown for Proba-3 mission launch

Sriharikota (Andhra Pradesh), Dec 5: ISRO on Thursday commenced a revised 8.5 hour countdown for the launch of the European Space Agency’s Proba-3 mission.

The Bengaluru-headquartered space agency had originally planned to launch European Space Agency’s (ESA) Proba-3 at 4.08 pm on Wednesday from the spaceport here. However, minutes before the lift-off, following the request from the European Space Agency, ISRO rescheduled the launch of PSLV-C59/PROBA-3 to December 5, 4.04 pm.

It was rescheduled following an anomaly detected in the satellite propulsion system.

In an update on Thursday, ISRO said, “PSLV-C59/PROBA-3 Mission. Countdown commenced. Lift-off time 16.04 pm IST, 5th December 2024. Stay tuned as PSLV-C59 prepares to deploy ESA’s Proba-3 satellites into orbit.”

NewSpace India Ltd, the commercial arm of ISRO has bagged the order from the ESA.

The Proba-3 (Project for Onboard Anatomy) consists of two satellites — Coronagraph (310kgs) and Occulter (240kgs) — in which two spacecraft would fly together as one, maintaining precise formation down to a single millimetre to study the Corona, the Sun’s outer atmosphere.

The ESA said the Corona is much hotter than the Sun itself and it is where space weather originates. It is also a topic of widespread scientific and practical interest.

For ISRO, besides providing its trusted workhorse PSLV vehicle for the launch, this mission would provide key insights on taking up scientific experiments on the Sun after its maiden mission–Aditya-L1 which was successfully launched in September 2023.

Proba-3 is a technology demonstration mission funded via the General Support Technology Programme. The instruments onboard the satellites would travel closer to the solar rim for up to six hours at a time and each spacecraft would take up approximately a 19-hour orbit around the Earth.

‘Probas’ is a Latin word, meaning ‘Let’s try’.

The mission objective is to demonstrate precise formation flying and the two spacecraft inside the satellites would be launched together in a stacked configuration after the desired orbit level is reached.

PSLV-C59 is a 44.5 metre tall rocket and is on its 61st flight and the 26th with the PSLV-XL variant which is normally used to place heavy satellites.

After the lift-off (4.04 pm) the two satellites (Coronagraph and Occulter) would undertake an 18-minute journey to reach the desired orbit.

The two spacecraft after reaching the preparatory conditions, would fly 150 metres apart (as one large satellite structure) in tandem so that the ‘Occulter’ spacecraft would block out the solar disk of the Sun enabling ‘Coronagraph’ to study the corona of the Sun or the surrounding atmosphere, for scientific observation. (PTI)

Hot this week

Meghalaya man missing in Bangkok

Shillong, Jan 10: A 57-year-old Meghalaya resident, Mr. Treactchell...

ANSAM rejects Kuki’s separate administration demand, says bifurcation not acceptable

Guwahati, Sept 8: Rejecting the separate administration demand of...

Pay hike of Assam ministers, MLAs likely as 3-member panel submits report

Full report likely by Oct 30 Guwahati Sept 25: There...

Meghalaya’s historic fiber paves the way for eco-friendly products and sustainable livelihoods

By Roopak Goswami Shillong, Oct 25: From making earbuds to...

The Baghmara connection to Meghalaya’s political history

Tura, Aug 17: For many in the state, Baghmara...

EU leadership’s visit to India next week will enhance ties: MEA

New Delhi, Feb 22: European Commission President Ursula von...

It was God’s plan, as Nagesh sir, my coaches must have cried happy tears: MIs Amanjot

Bengaluru, Feb 22: Amanjot Kaur's all-round brilliance sealed Mumbai...

Manipur MP urges MLAs to unite for peace and stability

Imphal, Feb 22: Manipur Rajya Sabha MP Leishemba Sanajaoba...

Mizoram: Assembly pays tributes to former PM Manmohan Singh

Aizawl, Feb 22: The Mizoram Assembly on Friday paid rich...
spot_img

Related Articles

Popular Categories

spot_imgspot_img