Keralam CM Satheesan to take up NH safety concerns with NHAI after deaths of eight students

Thiruvananthapuram, Sep 5: Keralam Chief Minister V D Satheesan on Saturday expressed concern over recurring accidents and safety issues on National Highway stretches in the state following the death of eight engineering students in Thrissur district.

Eight students from Tamil Nadu were killed late Friday night when the car in which they were travelling rammed into a lorry parked on NH-66 at Kaipamangalam in Thrissur district.

In a post on X, Satheesan said he was “deeply concerned” over the increasing number of accidents and safety issues on National Highways in Keralam, particularly on stretches under construction.

He said he would urgently raise the matter with the National Highways Authority of India and urged Union Road Transport and Highways Minister Nitin Gadkari to order a comprehensive safety review of ongoing highway projects in the state.

“Request Union Minister Nitin Gadkari to kindly accord high priority to a thorough safety review and immediate corrective action on NH projects in the State. Public safety must remain paramount,” he said.

Earlier in the day, Keralam Sports Minister O J Janeesh, who represents Kodungalloor in Thrissur district, also criticised the NHAI following the deaths of the eight engineering students.

Janeesh alleged that the NHAI had been uncooperative whenever public representatives convened meetings or raised concerns over construction work on NH-66.

“From the visuals, it appears that the car crashed into the rear of a parked vehicle. The spot where the vehicle was parked on the highway was not a designated parking area. That is a major issue,” he said.

He pointed to inadequate lighting on the highway and alleged shortcomings in the placement of signboards and speed-control measures at locations where construction work was under way.

“Representatives of the people, including myself, have been continuously meeting and demanding action regarding the black spots along that highway route,” Janeesh said.

He said he had attended around three meetings convened to discuss the issue, which were attended by MLAs from constituencies through which the highway passes, besides the district collector and the SP.

Instructions had been issued to identify locations lacking signboards and proper warning systems and take corrective measures, he said.

“Based on our current understanding, the spot where the accident occurred was not among the previously identified black spots. This is the first time an accident has happened there. Nevertheless, the accident appears to have occurred after a vehicle was parked in an unauthorised area,” Janeesh said.

He alleged that the NHAI frequently carried out construction work without adequately coordinating with local authorities or addressing concerns raised by public representatives.

“The authority frequently acts in a manner that shows no regard for human life,” he alleged.

Janeesh said public representatives had to insist on meetings with NHAI officials, including when schools were reopening, to raise safety concerns.

He cited instances of people using ladders to cross the highway at several locations, including Guruvayur, saying they resorted to such unsafe shortcuts because proper crossing facilities were unavailable and they otherwise had to take long detours.

“During construction stages, there are no proper mechanisms to verify or prevent these unsafe practices,” he said.

The minister alleged that proper signboards and warning systems were often not installed at entry and exit points of diversions.

“A vehicle travelling at high speed suddenly encounters a diversion, with no possibility of spotting it from a distance. I am referring to the general condition prevailing along the National Highway, not just this single incident,” he said.

Janeesh raised concerns over the availability of NHAI officials for coordination.

He said only one project director was designated for the Palakkad and Thrissur regions and questioned whether the official was able to adequately coordinate the issues.

“I don’t think he can properly coordinate all these issues. He is rarely present when called for meetings. It was only at a recent meeting convened at the collectorate that the PD was present,” he said.

Janeesh said the NHAI must examine whether failures in maintaining warning systems during construction contributed to the accident.

The NHAI is yet to respond to the allegations. (PTI)

Hot this week

Pay hike of Assam ministers, MLAs likely as 3-member panel submits report

Full report likely by Oct 30 Guwahati Sept 25: There...

Meghalaya Biological Park Inaugurated After 25 Years: A New Chapter in Conservation and Education

Shillong, Nov 28: Though it took nearly 25 years...

ANSAM rejects Kuki’s separate administration demand, says bifurcation not acceptable

Guwahati, Sept 8: Rejecting the separate administration demand of...

Meghalaya’s historic fiber paves the way for eco-friendly products and sustainable livelihoods

By Roopak Goswami Shillong, Oct 25: From making earbuds to...

Meghalaya man missing in Bangkok

Shillong, Jan 10: A 57-year-old Meghalaya resident, Mr. Treactchell...

KPSC irregularities: Priyank Kharge assures ‘no nonsense’ investigation

Kalaburagi (Karnataka), Sep 5: With the CID probing alleged...

Meghalaya’s small debt, big build

Shillong, Sept 5: In Shillong, a newborn who once...

Isak nets double and Barcola debuts in Liverpool’s first win of season under new coach

Ipswich (England), Sep 5: Alexander Isak scored twice and...

Death toll due to flash floods in Nepal rises to 1,344

Kathmandu, Sep 5: The death toll due to the...

India votes in favour of UNGA resolution endorsing new world map

United Nations, Sep 5: India has voted in favour...
spot_img

Related Articles

Popular Categories