Mumbai-Pune Expressway connecting link now fully operational

Mumbai, May 2 : The Mumbai-bound carriageway of the Mumbai-Pune Expressway connecting link was opened to vehicular traffic on Saturday noon after a delay caused by the dismantling of inauguration infrastructure and cleaning work, a day after the Pune section became operational.

The 13.3 km-long “missing link”, which bypasses a section of the Bhor Ghat stretch of the expressway and cuts travel time between Mumbai and Pune by 25 to 30 minutes, was inaugurated a day earlier by Chief Minister Devendra Fadnavis in the presence of Deputy CMs Eknath Shinde and Sunetra Pawar.

The Pune-bound carriageway of the corridor was opened to traffic immediately; however, the Mumbai-bound section remained closed to traffic for several hours after the inauguration.

An official of the Maharashtra State Road Development Corporation told PTI on Saturday that the opening of the Mumbai-bound carriageway was delayed mainly due to the dismantling of the inauguration infrastructure and cleaning work.

The removal of the stage and other decorations was completed in the morning. The work to load and transport the material slightly delayed the opening of the carriageway.

Vehicular movement on the carriageway began after all the remaining material was cleared and road cleaning was completed, the official added.

The expressway control room said that despite significant vehicular movement, the access-controlled highway has not witnessed any major traffic snarls since Friday evening, after the Pune-bound carriageway of the missing link was opened to traffic.

The Missing Link project connects Khopoli (in Raigad) on the Mumbai side to Kusgaon near Lonavala in Pune district and is expected to make the expressway fully access-controlled, easing congestion in the ghat section.

Developed by the MSRDC and dubbed an “engineering marvel”, the project includes two tunnels, two viaducts and a cable-stayed bridge over Tiger Valley. It bypasses the steep, accident-prone ghat section, where frequent traffic snarls are reported during weekends and on public holidays. (PTI)

Hot this week

Pay hike of Assam ministers, MLAs likely as 3-member panel submits report

Full report likely by Oct 30 Guwahati Sept 25: There...

Meghalaya Biological Park Inaugurated After 25 Years: A New Chapter in Conservation and Education

Shillong, Nov 28: Though it took nearly 25 years...

ANSAM rejects Kuki’s separate administration demand, says bifurcation not acceptable

Guwahati, Sept 8: Rejecting the separate administration demand of...

Meghalaya’s historic fiber paves the way for eco-friendly products and sustainable livelihoods

By Roopak Goswami Shillong, Oct 25: From making earbuds to...

Meghalaya man missing in Bangkok

Shillong, Jan 10: A 57-year-old Meghalaya resident, Mr. Treactchell...

Relocation of street vendors a model of development: Paul

Shillong, July 31: Adviser to Social Welfare department Paul...

John Abraham wants to see a Ronaldo or a Messi from NE

Shillong, July 31: Bollywood actor and entrepreneur John Abraham...

Tura girl represents India in C’wealth Youth Parliament

Shillong, July 31: A student of Don Bosco College,...

Paul vouches for Shillong Ropeway, questions timing of opposition

Shillong, July 31: Former Tourism Minister Paul Lyngdoh has...

Assam Cabinet to ask insurance cos, NBFCs for moratorium to flood-hit people

Guwahati, July 31: The Assam government on Friday decided...

Flash floods inundate parts of Manipur’s Churachandpur, one person missing

Churachandpur, Jul 31: Heavy rainfall triggered flash floods in...
spot_img

Related Articles

Popular Categories