NASA-ISRO collaborative satellite NISAR all set for launch

Sriharikota (Andhra Pradesh), Jul 30: Aimed at boosting ties between India and the United States on space exploration, India is geared up to launch an earth observation satellite jointly developed by ISRO and NASA on Wednesday.

Eyeing to study the planet Earth as a whole from a Sun-synchronous Orbit, the NISAR satellite is a combination of human skills and exchange of software and hardware between the two space agencies for over a decade.

NISAR, an acronym for NASA-ISRO Synthetic Aperture Radar satellite, weighing 2,393 kg is expected to fly on a 51.7 metre tall, three stage, GSLV-F16 rocket at a prefixed time of 5.40 pm from the second launch pad at this spaceport situated about 135 km from Chennai on Wednesday.

The countdown for the launch commenced at 2.10 pm on July 29 and has been progressing, ISRO said, and the mission would be classified into launch phase, deployment phase, commissioning phase and science phase.

“GSLV-F16/NISAR Today’s the day! Launch Day has arrived for GSLV-F16 and NISAR. GSLV-F16 is standing tall on the launch pad. NISAR is ready. Liftoff today,” ISRO said in a social media post on Wednesday.

While the partnership between ISRO and NASA is first of its kind, it is also the first time for a GSLV rocket to carry a rocket destined to Sun-synchronous Polar Orbit (SSPO) unlike Polar Satellite Launch Vehicles.

The Bengaluru-headquartered ISRO has sent similar missions in the past (Resourcesat, RISAT) to study the Earth but were “operationally focused” on Indian territory. The NISAR mission is targeted to study the Earth and would provide information to global scientific fraternity, ISRO said.

The satellite would be able to study seasonal changes on forest dynamics, mountain shifts, glacier movements in the Himalayas and Antarctica, North and South poles.

NISAR mission’s primary objectives are to study land and ice deformation, land ecosystems, and oceanic regions in areas of common interest to the United States and Indian science communities.

ISRO said the complex payloads and mainframe systems in the mission have been designed, developed, and realised over a period of 8 to 10 years.

Scientists from both space agencies were involved in extensive collaborations and the NISAR satellite carries dual frequency — two L Band provided by NASA and S-Band provided by ISRO for the Synthetic Aperture Radar (SAR) enabling the collection of a vast amount of data.

The S-Band SAR and L-Band SAR were independently developed, integrated and tested at ISRO and Jet Propulsion Laboratory, NASA, United States, respectively, ISRO said.

After reaching the initial orbital conditions on Wednesday, scientists would engage in ‘commissioning’ the satellite.

The first 90 days after launch would be dedicated to commissioning or to perform In-Orbit Checkout, the objective of which is to prepare the observatory for science operations, ISRO said.

The dual-band Synthetic Aperture Radar employs an advanced, SweepSAR technique, which provides high resolution and large swath imagery. NISAR would image the global land and ice-covered surfaces, including islands, sea-ice and oceans, every 12 days.

The spacecraft and the launch system are developed by ISRO while the L-band Radar system, high speed downlink system, GPS receiver are delivered by NASA. ISRO is responsible for the satellite and commanding operations, while NASA would provide the orbit manoeuver and RADAR operations plan.

NISAR mission would be aided with ground station support of both the two space agencies for downloading the acquired images, which, after the necessary processing, would be disseminated to the user community.

GSLV-F16 is the 18th flight of Geosynchronous Satellite Launch Vehicle and the 12th with indigenous cryogenic stage. It is also the 102nd launch from Sriharikota.

The life of the NISAR Mission is 5 years, ISRO said.(PTI)

Hot this week

Pay hike of Assam ministers, MLAs likely as 3-member panel submits report

Full report likely by Oct 30 Guwahati Sept 25: There...

Meghalaya Biological Park Inaugurated After 25 Years: A New Chapter in Conservation and Education

Shillong, Nov 28: Though it took nearly 25 years...

ANSAM rejects Kuki’s separate administration demand, says bifurcation not acceptable

Guwahati, Sept 8: Rejecting the separate administration demand of...

Meghalaya man missing in Bangkok

Shillong, Jan 10: A 57-year-old Meghalaya resident, Mr. Treactchell...

Meghalaya’s historic fiber paves the way for eco-friendly products and sustainable livelihoods

By Roopak Goswami Shillong, Oct 25: From making earbuds to...

Foreign Secy Misri meets senior leader of CPC

New Delhi, Jan 14: India on Wednesday underlined the...

NEHU bodies seek CM’s intervention to end crisis  

‘Stalemate leads to delay in salary of 900 non-teaching...

Jowai market complex may be completed before deadline

Shillong, Jan 14: The long-delayed Jowai Shopping Market Complex...

I-PAC raids: Cal HC disposes of TMC’s petition, adjourns ED’s application

Kolkata, Jan 14: The Calcutta High Court on Wednesday...

Tura Medical College to be Govt-run institution

Shillong, Jan 14: Health Minister Wailadmiki Shylla has declared...

Ban on illegal fish imports from Bangladesh

Shillong, Jan 14: The district administration of Eastern West...

Contractual nurses to get pending salary in Jan: Shylla  

‘PHC Plus model with more beds, doctors aims to...

Export preparedness ranking reflects Meghalaya’s readiness, scope for improvement

State ranked ‘Challenger’ as minerals and niche agri-products drive...
spot_img

Related Articles

Popular Categories