Power cuts due to maintenance work: MeECL

Shillong, Dec 4: The MeECL has clarified that the frequent power cuts in the state are load-shedding, but shutdowns for maintenance and upgradation work.

“Shutdown needs to be taken, we are taking a lot of work under RDSS and other schemes to upgrade the lines. They can’t be done on live lines; notices are given in newspapers every day,” said Sanjay Goyal, Chairman-cum-Managing Director of Meghalaya Energy Corporation Limited (MeECL).

Speaking to reporters on Thursday, Goyal said shutdowns are necessary to repair and strengthen the power infrastructure.

“It’s the only season when we can do the work. It will continue in various localities on various dates,” he said.

Clarifying that load-shedding is not being implemented, he said, “There is no load-shedding. Shutdown can also be due to local issues, like a meter catching fire, and we have to cut the line and remove the wire.”

The MeECL CMD urged residents to bear with the disruptions, saying, “You have to give time to MeECL to repair and strengthen the lines. The impact will be seen after a year when there are strong winds and no power cuts.”

MeECL is undertaking extensive work, including adding 2,500 transformers, 4,500 km of new lines, and replacing 1,000 km of wires.

Goyal assured that efforts are being made to minimise disruptions, especially during exam time.

Hot this week

Pay hike of Assam ministers, MLAs likely as 3-member panel submits report

Full report likely by Oct 30 Guwahati Sept 25: There...

Meghalaya Biological Park Inaugurated After 25 Years: A New Chapter in Conservation and Education

Shillong, Nov 28: Though it took nearly 25 years...

ANSAM rejects Kuki’s separate administration demand, says bifurcation not acceptable

Guwahati, Sept 8: Rejecting the separate administration demand of...

Meghalaya man missing in Bangkok

Shillong, Jan 10: A 57-year-old Meghalaya resident, Mr. Treactchell...

Meghalaya’s historic fiber paves the way for eco-friendly products and sustainable livelihoods

By Roopak Goswami Shillong, Oct 25: From making earbuds to...

Vijay Deverakonda, Rashmika Mandanna get married, share loved up messages, photos

Udaipur, Feb 26: Actors Vijay Deverakonda and Rashmika Mandanna...

Rs 441-cr dam safety project eyes completion in 2028

Shillong, Feb 26: The Dam Rehabilitation and Improvement Project...

State to get 12% free power from small hydro projects

Shillong, Feb 26: The Meghalaya Power Generation Corporation (MePGCL)...

National Space Science Symposium

Astronaut Subhanshu Shukla links solar lessons to CM's Mission Shillong,...

Conrad rules out political bias in sanctioning funds

File movement on an average took 26 days, now...

KHADC disbursed Rs 86 lakh without UC: KHNAM

Shillong, Feb 26: Making a pitch for transparency in...

Over 650 vacant posts in state police units  

2,832 personnel in state police against sanctioned strength of...

Employment generation schemes yielding results: CM

Within 20 days, we received 22,000 applications for CM-Elevate...
spot_img

Related Articles

Popular Categories